title: Free Rework Guide | Imerso
---

[Skip to main content](https://www.imerso.com/causes-of-rework-bim-clash-detection-cant-prevent#main-content)

[![Imerso Construction Inspection Software](https://www.imerso.com/hs-fs/hubfs/logo.png?width=100&height=100&name=logo.png) ![Imerso Construction Inspection Software](https://www.imerso.com/hs-fs/hubfs/logo.png?width=100&height=100&name=logo.png)](https://www.imerso.com?hsLang=en)

- [Product](https://www.imerso.com/product)
- [Pricing](https://www.imerso.com/pricing)
- [Case Studies](https://www.imerso.com/case-studies)
- Show submenu for Resources  Resources 
  
    - [Imerso Blog](https://www.imerso.com/blog)
    - [The Illustrated Guide to Site Issues in BIM Projects (PDF)](https://www.imerso.com/causes-of-rework-bim-clash-detection-cant-prevent)
    - [The Lean Construction Playbook (PDF)](https://www.imerso.com/the-lean-construction-playbook)
- [Contact](https://www.imerso.com/contact-us)

Open main navigation

Close main navigation

- [Product](https://www.imerso.com/product)
- [Pricing](https://www.imerso.com/pricing)
- [Case Studies](https://www.imerso.com/case-studies)
- Show submenu for Resources  Resources 
  
    - Resources
    - [Imerso Blog](https://www.imerso.com/blog)
    - [The Illustrated Guide to Site Issues in BIM Projects (PDF)](https://www.imerso.com/causes-of-rework-bim-clash-detection-cant-prevent)
    - [The Lean Construction Playbook (PDF)](https://www.imerso.com/the-lean-construction-playbook)
- [Contact](https://www.imerso.com/contact-us)
- [Log in](https://app.imerso.com/)
  
  [Book a demo](https://www.imerso.com/book-demo)

[Log in](https://app.imerso.com/)

[Book a demo](https://www.imerso.com/book-demo?hsLang=en)

## Your BIM model is perfect. **Your jobsite isn't.**

Clash-free models and airtight drawings are a tremendous achievement — but they only describe what ***should*** happen on site. It's not a guarantee of what actually ***does***. 

Here's how to bridge the gap between virtual perfection and real-world execution.

![REWORK2](https://www.imerso.com/hs-fs/hubfs/REWORK2.png?width=775&height=555&name=REWORK2.png)

 GET THE FREE PDF

#### Real causes of costly rework delays in BIM projects

### In this guide:

You'll learn that BIM has been primarily used as a planning and design tool, but not really as a strategy for execution management. This means that regardless of sophisticated techniques like BIM clash control and model coordination, there is no guarantee that the modelled plans will be executed in reality. Unawareness and over-reliance on BIM alone leave dangerous blind spots that affect every project.

###### Limitations of BIM

###### BIM reliance blind-spots

###### Execution tracking

![Reworkv2-min](https://www.imerso.com/hs-fs/hubfs/Reworkv2-min.png?width=885&height=398&name=Reworkv2-min.png)

- ![Structure rebar issues found by Imerso](https://www.imerso.com/hs-fs/hubfs/Structure%20rebar%20issues%20found%20by%20Imerso.png?width=800&height=500&name=Structure%20rebar%20issues%20found%20by%20Imerso.png)
- ![rework issues misplaced openings guide](https://www.imerso.com/hs-fs/hubfs/rework%20issues%20misplaced%20openings%20guide.png?width=800&height=500&name=rework%20issues%20misplaced%20openings%20guide.png)
- ![NHN case rotated column steel](https://www.imerso.com/hs-fs/hubfs/NHN%20case%20rotated%20column%20steel.png?width=800&height=500&name=NHN%20case%20rotated%20column%20steel.png)
- ![rework issues guide prefab junctions](https://www.imerso.com/hs-fs/hubfs/rework%20issues%20guide%20prefab%20junctions.png?width=800&height=500&name=rework%20issues%20guide%20prefab%20junctions.png)
- ![Rework issues pipes sewage guide](https://www.imerso.com/hs-fs/hubfs/Rework%20issues%20pipes%20sewage%20guide.png?width=800&height=500&name=Rework%20issues%20pipes%20sewage%20guide.png)
- ![Rework issues guide misplaced walls](https://www.imerso.com/hs-fs/hubfs/Rework%20issues%20guide%20misplaced%20walls.png?width=800&height=500&name=Rework%20issues%20guide%20misplaced%20walls.png)

## See what Imerso finds on a real jobsite **in 30 minutes**

We'll walk you through a live analysis on a real project — and show what Imerso can do.

30 minutes · No commitment · See live results

Book a free demo

©2026 Imerso AS. All rights reserved. [Privacy Policy](https://www.imerso.com/privacy-policy?hsLang=en)